EGS | ERG Headquarters Development Update Log

ERG Headquarters

Epsilon Research Group (developed by Epsilon Game Studios)

:hammer_and_wrench: Development Update Log


This post contains a history of development update logs from the official Epsilon Game Studios communications server for Epsilon Research Group's Headquarters (also known as Bristol Valley Campus).

Version 3 Updates

Build 4663 Beta 1 (04/05/2025)

Changes

  • Completely revamped:
    • Buildings
    • Terrain
    • Structures
    • …basically the entire map from scratch.
  • Added functional vehicles for transportation
  • Small crossover branch with Epsell (replaces the merchandise store)
  • Departmental Complex merged with Administrative Offices to form Departmental Offices building (main HQ building)
  • Proper road network throughout the campus
  • More detail in every aspect of the game
  • New cafe under construction
  • Car parks for visitors, employees and TEC HQ
  • …and much, much more changes for you to check out in-game (i can’t think of any other points).

Version 2 and 1 Updates

16/02/2025
  • ERG Headquarters (Bristol Valley Campus) is now public again - the technical issues have been resolved. No further updates or bug fixes will be pushed out at this time, however an extensive revamp of the game is planned in the future to bring the game up to current building standards

  • Other update details for these versions have been lost.

Links


© Epsilon Game Studios